Add Plan A: Tauri 2 backend port implementation plan

Eight tasks from system-dep install through verified deb/appimage
bundles, with a webkit2gtk-4.1 go/no-go gate at Task 2 and n-link-cli
used as the verification oracle against the connected CX II.

Splits the spec's two phases into two plans; Plan B (frontend) is
written after Plan A is verified so it can be grounded in the real
scaffold output rather than assumptions.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
This commit is contained in:
Your Name 2026-07-19 09:08:53 -04:00
parent 754fbf9c70
commit 8db940edc8

File diff suppressed because it is too large Load diff